DEMO MODE· Read-only demo with synthetic dataLearn more on assaycore.pro
Compliance
ISO 17025NELAPEPA 8270DEPA 200.8SW-846SDWACWARCRA TCLP

Interactive marketing demo running on Vercel with mock data. Click any feature to explore — no account needed.

Production stack for AssayCore Env

Core: PostgreSQL 16 + Redis 7 + Kafka 3.7 + MinIO + Keycloak 24 + Spring Boot 3.3 (Kotlin) + React 18/MUI + FastAPI ML (Python 3.11) + Nginx + Docker

Module-specific: EPA EDD packager + state EDD variants (CA GeoTracker, TX TRRP) · EPA SW-846 holding-time engine with auto-block on breach · QC batch protocol (blanks + LCS + matrix spike) · IoT cold-chain temperature loggers · Chain-of-custody with GPS + e-signature

Deployable on your infrastructure or our managed Hetzner. Self-hosted source-license available.

Remediation Cost Modeller

Cost & time modelling for remediation technologies · US EPA FRTR · NPV & risk reduction comparison

EPA FRTR · EPA 542-R-04-023 Cost & Performance · ITRC IDSS-1 · Pump&Treat / ISCO / MNA / Thermal / Phytorem

Projects

20

Scenarios

4

Cost Range

$0.5M – $16.5M

NPV Median

$1.3M

ProjectTechnologyCost ($M)Duration (yr)NPV ($M)Risk Red. %RiskRegulator
Oak Street PCE Plume
Oak Street Superfund
Phytoremediation
Passive MNA
$9.80M19+1.33M77.5%HighState DEQ
Industrial Park TCE Source
Industrial Corridor
MNA (Monitored Natural Attenuation)
Aggressive Remediation
$6.02M11+2.53M36.9%LowState DTSC
Former Refinery Benzene Zone
Refinery NE Boundary
MNA (Monitored Natural Attenuation)
Passive MNA
$3.84M13+0.61M70.1%MediumState DEQ
Airport PFAS Groundwater
Airport South Perimeter
Pump & Treat
Aggressive Remediation
$10.33M22+3.49M37.4%HighEPA Region 9
North Ave LNAPL Recovery
North Avenue Corridor
MNA (Monitored Natural Attenuation)
Hybrid Approach
$7.57M10-1.37M73.1%MediumEPA Region 2
Dry Cleaner Cluster Site
Downtown Block D
Thermal Treatment (ERH/ISTD)
Base Case
$10.36M18+5.58M91.9%LowEPA Region 9
Chrome Plating DNAPL
Metal Finishing District
Pump & Treat
Hybrid Approach
$2.97M11+1.32M91.2%LowEPA Region 2
Municipal Landfill Leachate
Westside MSW Landfill
Pump & Treat
Passive MNA
$11.37M21+4.99M39.9%MediumState DTSC
Oak Street PCE Plume
Oak Street Superfund
Thermal Treatment (ERH/ISTD)
Hybrid Approach
$6.52M23-1.07M97.8%LowEPA Region 2
Industrial Park TCE Source
Industrial Corridor
Pump & Treat
Aggressive Remediation
$11.05M3-1.58M55.2%MediumEPA Region 5
Former Refinery Benzene Zone
Refinery NE Boundary
Phytoremediation
Aggressive Remediation
$7.11M17+1.68M86%HighState DTSC
Airport PFAS Groundwater
Airport South Perimeter
Thermal Treatment (ERH/ISTD)
Base Case
$0.55M5-0.08M83.6%LowState DEQ
112 / 20
1 / 2

Sources: US EPA Federal Remediation Technologies Roundtable (FRTR) · EPA 542-R-04-023 · ITRC Integrated DNAPL Site Strategy (IDSS-1) · EPA Contaminated Site Clean-Up Information (CLU-IN)